top of page


The Official Residence of the Consul General of the Philippines
Total Amount: $1,269,000
Completion Date: May, 2017
​
Scope of Work:
Demolition of existing structures. Construction of exterior storm and sewer drainage system and waterline system. Construction of driveways and walkways, perimeter fence to include motor operated double swing gate and pedestrian gate and retaining wall. Construction of 2-story concrete building structure with basement. Installation of Architectural, Mechanical, Electrical, and Plumbing works.