WMES Engineering Office 

Total Amount: $1,910,532.11

Completion Date:  September, 2017

Scope of Work:

Demolition of existing chainlink fence. Paving & surfacing such as removal of existing AC pavement, grading & levelling and compaction of basecourse. Construction of 3 story building. Installation of all utilities such as waterline, sewer and drainage system. Installation of architectural and mechanical such as electric water heater, pumps and air-conditioning. Plumbing works and electrical such as Standby Generator Set. Installation of Fire Alarm equipment.